A multi-tenant office building
A building manager needed to confirm compliance across multiple split systems before a local authority audit, while dealing with rising utility bills and conflicting tenant thermostat settings.
- 1Capacity AuditCalculated aggregate output across all floors to confirm statutory reporting requirements.
- 2Visual InspectionAssessed physical condition and operational status of twenty split system units.
- 3Control ReviewCorrected conflicting setpoints and out-of-hours running schedules across office zones.
- 4Portal RegistrationSubmitted completed survey data directly to the national Landmark register.
Commercial Office Compliance Survey
Engineers inspect all indoor and outdoor cooling units on site, calculate total system output, and examine controller schedules. The team identifies timeclocks running overnight, outlines corrective maintenance steps, and registers the official certificate on the government database to satisfy regulatory requirements.
- Full inspection of split and VRF indoor and outdoor units
- Audit of system documentation, service logs, and F-Gas records
- Analysis of controller schedules to identify unnecessary energy run-hours
- Direct upload of certified data to the central Landmark register